Scheduling
Tour
Construction during the day
Tour during the evening
Which evening works?
Jill, Matt and Nishima can't do Wednesday eve
Pelle can't do Monday eve
Potential Tour/Interview Thursday
2 cameras
2 tripods
light kit
2 wired lavs
1 shotgun
XLR cables
Outdoor shot Tuesday
1 camera
1 tripod
shotgun mic
1 handheld mic
XLR cables
Questions
Crew Roles
Producer - KC
Director -
Writer -
Suggested look: Penne
16x9
24p
Scheduling
Tour
Construction during the day
Tour during the evening
Which evening works?
Jill, Matt and Nishima can't do Wednesday eve
Pelle can't do Monday eve
Potential Tour/Interview Thursday
2 cameras
2 tripods
light kit
2 wired lavs
1 shotgun
XLR cables
Outdoor shot Tuesday
1 camera
1 tripod
shotgun mic
1 handheld mic
XLR cables
Questions
Crew Roles
Producer - KC
Director -
Writer -
Suggested look: Penne
16x9
24p
Scheduling
Tour
Construction during the day
Tour during the evening
Which evening works?
Jill, Matt and Nishima can't do Wednesday eve
Pelle can't do Monday eve
Potential Tour/Interview Thursday
2 cameras
2 tripods
light kit
2 wired lavs
1 shotgun
XLR cables
Outdoor shot Tuesday
1 camera
1 tripod
shotgun mic
1 handheld mic
XLR cables
Questions
Crew Roles
Producer - KC
Director -
Writer -
Suggested look: Penne
16x9
24p
Location
Central Square Theater
http://www.centralsquaretheater.org/
What is the angle?
Inclusive by design
http://www.vsamass.org/inclusivebydesign.htm
Issue with Inclusion by design
-time constraint of three week course
-the event isn't going to happen until July
-maybe not access to any previous performance
Collaboration
Nora Theater company
Underground Railway Theater
What's available?
The site
Narrative tour
Let's think about making the piece inclusive by design...what does that mean?
Let's get different perspectives in interview.
Administration
Artist
Client
Working Title: Thank God It's a Theater!
broadly about the vision...
story emerges from the tour guides.
First shoot of the MVP class was a success! We did a three camera shoot at the Middle East Upstairs! Thanks to everyone at the Middle East and to Harlo for getting us in there! Thanks also for the band who were great to work with. Check out some of the photos I took while we were shooting.
For the first time at SMI we are documenting the entire summer with a short movie that has been being filmed since the beginning of the program. The documentary will include interviews with the 14 SMI participants and the youth trainers and will show the progression of the teens throughout the summer. Ultimately this production will be used by CCTV to present to funders and interested organizations.
The first project that the youth created was a personal narrative on a location in Cambridge that is important to them. In the documentary the participants reveal their ideas for the project, opinions about it and talked of the process of making it. Overall the assignment was liked, although some individuals found it slightly dull and would have preferred doing a music video as some have done in previous years. Despite some negative feelings, most of the productions came out great. Check them out here. read more...
- B roll of 56 brattle and 54 brattle.
- set up interview with Jim Tuesday night @ 7 @ 42 brattle
- set up interview Anita Israel Wednesday @ 9AM
- Wednesday for class we will review footage, write any narration and start logging and capturing